---outdoor CFL
floodlight fixture
features:
body;injection moulded. opaque UV stabilized polycarbonate body,waterproof gasket in natural silicon gel,stainless aluminum die casing flood lamps,it is much less weight, much less cost and much energy saving and more convenient.
reflector: mirror aluminum reflector.
diffuser: injection moulded, transparent UV stabilized polycarbonate diffuser,highly impact resistant two clips at opened.The granule prismatic design hides the electrial components inside.
We have CE for above PC plastic ouedoor cfl fixture, comply with the IEC standrad as following:
EN60598:2004+A1:2006
EN60598-2-5:1998
EN60598-2-1:1989
advantage
1. CE and RoHS approved.
2. Die-casting aluminum casing and high intensity toughened glass cover
3. High efficiency and power factor LED driver
4. Wide radiation angle, huge lighting area
5. Start without delay and flicker free
6. Good color rendering
7. Warm and cold color temperature are available
8. High shock & vibration resistant
9. Ideal heat dissipation design
10. No UV & IR, No Blinking and No Mercury & Lead free
11. Energy saving system, saving 50% energy than the conventional
Metal halide lamp, Sodium Light or HPS light
The advantage of led Flood light: the light of lamps and lanterns area is large, light scattered light, in a small space play a role of the largest lighting in the workplace.
Led Flood light with the light body choose to adopt high quality aluminum alloy production, make the function of the light body heat to achieve higher efficiency; Also adopted the strong air flow design, more to ensure the heat dissipation effect; Adopting the combination of precision abrasive die-casting lamp body more compact connection, more effectively prevent the invasion of the impurities; The light source of lamps and lanterns USES imported high-quality high-power lamp bead to make, bright lighting highlight colour is unified, and life is also more durable, more soft light;
applications
Plaza, theme park, stage, bridge, shopping mall, Bar, Club, Corridor, Stage, Bay, Commercial Building, Hotel, Archway, Bridge ,
Tunnels, stations, airports, shopping malls, billboards, railway stations, public areas, industrial area, indoor lighting, parking, etc.
additional;
the minimum quantity:10piece/pieces
delivery date: within 15days after payment
volume of production: 500Piece/Pieces per Month
packing:standard export carton
transport: ocean
terms of payment: L/C.Western Union.T/T